The following information was submitted:
Transactions: INTERNATIONAL JOURNAL of COMPUTERS
Transactions ID Number: 19-838
Full Name: Ramon Montellano
Position: Doctor (Researcher)
Age: ON
Sex: Male
Address: Reforma 113. Colonia Palmira. Cuernavaca Morelos. CP 62490
Country: MEXICO
Tel: 7773623811
Tel prefix: +52
Fax:
E-mail address: rmg@iie.org.mx
Other E-mails:
Title of the Paper: A phased migration strategy to integrate the new data acquisition system into the laguna verde nuclear power plant
Authors as they appear in the Paper: Ramon Montellano-Garcia, Ilse Leal-Aulenbacher and Hector Bernal-Maldonado
Email addresses of all the authors: rmg@iie.org.mx,ileal@iie.org.mx,hmbernal@iie.org.mx
Number of paper pages: 9
Abstract: This paper focuses on the strategy applied in the gradual integration of a new data acquisition system with the online Plant Process Computer of the Laguna Verde Nuclear Power Plant. Due to the fact that the data acquisition modules needed to be replaced, the need for a New Acquisition System arose. The issue of whether or not to embark on a complete or modular replacement of its elements required careful consideration. At Laguna Verde, we opted for a phased migration approach, considering two main aspects: that the plant monitoring must remain online during the whole process, because it is required for plant operation and that human machine interfaces and computations design basis must be maintained, in order to minimize regulatory impact. The core of a phased migration strategy hinges on a flexible modular system capable of accepting data streams from multiple data acquisition systems and computers and consolidating this data for their presentation in control roo!
m displays and in the power plant historical archive. This paper describes the methodology that was applied to integrate the new data acquisition system into the legacy system, which is based on a real-time mechanism and historical data stream transfer.
Keywords: Data acquisition system, Gradual migration strategy, Historical archive synchronization, Obsolete plant process computer elements, Real-time external variables.
EXTENSION of the file: .pdf
Special (Invited) Session: A Gradual Data Acquisition Replacement Strategy for the Laguna Verde Nuclear Power Plant
Organizer of the Session: 638-218
How Did you learn about congress:
IP ADDRESS: 200.0.113.108