Tuesday, 19 January 2010

Wseas Transactions

New Subscription to Wseas Transactions

The following information was submitted:

Transactions: WSEAS TRANSACTIONS ON CIRCUITS AND SYSTEMS
Transactions ID Number: 89-354
Full Name: Siva Kumar Subramaniam
Position: Lecturer
Age: ON
Sex: Male
Address: Faculty of Electronics and Computer Engineering, Universiti Teknikal Malaysia Melaka, Karung Berkunci No. 1752, Pejabat Pos Durian Tunggal, 76109, Durian Tunggal Melaka, Malaysia.
Country: MALAYSIA
Tel: +6016-6661612
Tel prefix: +606-5552021
Fax: +606-5552112
E-mail address: siva@utem.edu.my
Other E-mails: cva1612@yahoo.com.my
Title of the Paper: Automated traffic light system for road user's safety in two lane road construction sites
Authors as they appear in the Paper: Siva Kumar Subramaniam, Vigneswara Rao Gannapathy, Sivarao Subramonian, Abdul Hamid Hamidon
Email addresses of all the authors: siva@utem.edu.my
Number of paper pages: 10
Abstract: The road construction safety traffic light system is designed to replace a manual traffic control on a road construction sites. This device can replace one or both flaggers during the two lane closures on the event of a road construction. The road construction safety traffic light system is considered one of the best devices in work zone traffic flow control systems. The device is a portable traffic light unit which can be best utilized in controlling traffic flow in a road construction site for long term or short term lane closures and to control two-way traffic in a single lane. By implementating new technologies in automating traffic flow in road construction site could possibly eliminate the usage of a conventional flagman at all times. The road construction safety traffic light system is a practical solution to solve problems which contribute towards hazards at road construction site and to be inline with the road safety regulation which is taken into granted!
by the contractors. The automated portable traffic light system can reduce direct costs in man power utilization and increase safety for the road users and construction workers by eliminating the need for a human flagmen. This system is applicable for public and privately funded road construction projects that require overnight or 24-hour traffic control as well as in different weather conditions.
Keywords: Intelligent traffic light system, programmable logic controller, smart control application, flagman, traffic light
EXTENSION of the file: .doc
Special (Invited) Session: Intelligent and self control safety traffic light system
Organizer of the Session: 697-164
How Did you learn about congress:
IP ADDRESS: 112.137.168.187